SW150C SEAWATER - GOLD MINE
Having installed this 150m3/day seawater RO system in March 2010 Rotech Water has continued to keep the system running to spec with regular servicing and the supply of quality chemicals, filters and spare parts.
SW150C SEAWATER - BARROW ISLAND
Rotech Water commissioned this 150m3/day seawater RO system at the Gorgon Project's Barrow Island Module Offloading Facility. As the system was going run only for a limited time in line with the concrete batching requirements of the project we supplied a "one-off" package of chemicals, filters and spare parts so the client could run their operation smoothly and without interruption...
BW300C BRACKISH - PILBARA MINE
Regular 3 monthly servicing, reliable supply of reagents and consumables and on site operator training has meant this 300m3/day brackish RO in the Pilbara has been operating effectively since installation in April 2012. The 450 man camp at this site requires all of its potable water to be generated from a high silica aquifer. Our selection of a quality, silica-specific...
Our Projects

SW150C SEAWATER - BARROW ISLAND
Rotech Water designed and manufactured this 150kL/day seawater RO system for a...
01 September 2014

BW300C BRACKISH - GOLD MINE
At a large gold mine in the Northern Territory reverse osmosis is...
01 September 2014

SW150C SEAWATER - GOLD MINE
The client at this gold mine required a new RO system to...
01 September 2014

BW300C BRACKISH - PILBARA MINE
Our client required 300kL/day of potable water from a feed stream high...
01 September 2014
Our Services

SW150C SEAWATER - GOLD MINE
Having installed this 150m3/day seawater RO system in March 2010 Rotech Water...
01 September 2014

SW150C SEAWATER - BARROW ISLAND
Rotech Water commissioned this 150m3/day seawater RO system at the Gorgon Project's...
01 September 2014

BW300C BRACKISH - PILBARA MINE
Regular 3 monthly servicing, reliable supply of reagents and consumables and on...
01 September 2014